A phased plan for new buildings, refurbishment and relocation of operations within an active industrial site.
A reconstructed building within the complex. ↗
Brief
Update an operating industrial and storage site, coordinating new and retained buildings.
Our work
Identified buildings to reconstruct or remove, placed the new block and storage functions, and coordinated the sequence of functional changes.
Result
A phased spatial strategy, architectural proposals and interior solutions for updating the complex.
01
Decide what to retain
The operating site needed a location for a new building, a strategy for retaining or reconstructing existing buildings, demolition decisions and an arrangement for open storage.
Existing buildings and proposed actions. ↗
02
Sequence the changes
The scenario coordinated existing and new buildings, relocation of functions and landscape improvements.
Overall layout of the updated complex. ↗
03
Continue into architecture
As of October 2026, the new building is nearing completion, with storage and staff facilities below and sports space on the upper floor. We are developing its interiors. A smaller building at the entrance has already been refurbished using our design proposals; a new roadside building is the next assignment. The site remains in use as redevelopment continues.