GUSt
Projects/ Ryazan

Ryazan / Corporate office / Site comparison

One office building. Two site options.

Two sites tested for the same office complex. Both worked; parking was the main cost difference.

2023 / 2026Site decision pending
Corporate office concept for the former depot site.
Corporate office concept for the former depot site.
Brief
Choose a site for an existing office concept after the original plot became unavailable.
Our work
Adapted the complex to two sites: building placement, uses and floor areas, parking, landscape and indicative construction costs.
Result
Two concept albums and a comparative report to support site selection. The larger plot was recommended; the final decision is pending.
01

An existing concept

We developed the first office concept in 2023, but the client could not acquire the original plot. We then adapted the established programme and design to two new sites and compared their construction implications.

The first concept, 2023: the architectural system before the change of site.
The first concept, 2023: the architectural system before the change of site.
02

Two different sites

The former trolleybus depot offered more room for buildings, parking and landscape. The second site required a tighter layout. Both options involved demolishing existing buildings.

Land beside the compact site, beneath high-voltage power lines, was also considered. Its availability required separate confirmation.

Depot option: a spacious site.
Depot option: a spacious site.
Compact option: a tighter urban layout.
Compact option: a tighter urban layout.
03

The same programme on both

We fitted the same programme to each site, allocated uses and floor areas, and calculated parking demand. Both options worked, allowing a comparison of specific designs rather than land area alone.

Depot option: uses distributed by floor.
Depot option: uses distributed by floor.
Compact option: the programme adapted to a different site.
Compact option: the programme adapted to a different site.

Colours distinguish functional blocks; the diagrams show how the programme fits each building.

04

Parking made the difference

In the larger site’s base scenario, surface parking met the requirement. The compact option needed substantial underground parking, which became the principal difference in indicative construction cost.

The depot site also accommodated a sports area, an entrance square and a small park. We tested several building positions and the retention of existing planting. Retaining it compromised the layouts studied, so new planting was proposed.

Depot option: a landscaped square in front of the main façade.
Depot option: a landscaped square in front of the main façade.

Larger site

Surface parking; room for sports and landscape.

Compact site

Underground parking; adjacent power-line land needs confirmation.

05

The decision is still ahead

The client received two concept albums and a comparison report. We recommended the depot site for its more economical parking strategy and room for sports and public space. The compact site remained a viable alternative. The client’s final decision is pending.

Project team and period

Chief Project Architect: Alexander Gast. Project lead: Alexander Kholodnov. Architects: Olga Vaulina and Evgeny Kwon. Coordinator: Olga Nabasova.

First concept: 2023. Adaptation and comparison of two new sites: 2026. The client’s final decision is pending.